|
Network Security Infrastructure Testing |
October 2005 |
U.S. Department of Energy, Sandia National Laboratory |
|
Reference Model for Control and Automation Systems in Electrical Power |
October 2005 |
U.S. Department of Energy, Sandia National Laboratory |
|
A Summary of Control System Security Standards Activities in the Energy Sector |
October 2005 |
U.S. Department of Energy, Sandia National Laboratory, Idaho National Laboratory, Argonne National Laboratory, Pacific Northwest National Laboratory |
|
Network Security Architecture for Demand Response/Sensor Networks |
October 2005 |
California Energy Commission |
|
A Comparison of Cross-Sector Cyber Security Standards |
September 2005 |
U.S. Department of Energy, Idaho National Engineering and Environmental Laboratory |
|
Advanced Control Technologies and Strategies Linking Demand Response and Energy Efficiency |
September 2005 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
Findings from the 2004 Fully Automated Demand Response Tests in Large Facilities |
September 2005 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
Evaluation of California's Real-Time Energy Metering (RTEM) Program |
August 2005 |
California Energy Commission |
|
IEEE C37.92-2005 - IEEE Standard for Analog Inputs to Protective Relays From Electronic Voltage and Current Transducers |
August 2005 |
IEEE |
|
IEEE C62.11-2005 - IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuits (>1 kV) |
August 2005 |
IEEE |
|
Cyber Assessment Methods for SCADA Security |
June 2005 |
U.S. Department of Energy, Idaho National Engineering and Environmental Laboratory |
|
Preliminary AMI Business Case Analysis |
June 2005 |
Pacific Gas & Electric |
|
IEC 60870-6/TASE.2 - Telecontrol equipment and systems - Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations |
May 2005 |
IEC |
|
IEEE C37.118 - 2005 - IEEE Standard for Synchrophasors for Power Systems |
May 2005 |
IEEE |
|
Intelligrid Consortium Consumer Portal Project |
April 2005 |
Electric Power Research Institute |
|
Advanced Demand Response System Field Trial 2005 Market Research for the Statewide Pricing Pilot |
April 2005 |
California Public Utilities Commission |
|
2005 Smart Thermostat Program Impact Evaluation |
April 2005 |
San Diego Gas & Electric |
|
Cyber Security for Utility Operations |
April 2005 |
United States Department of Energy Office of Energy Assurance |
|
Application for Adoption of an AMI Deployment Scenario and Associated Cost Recovery and Rate Design (2005) |
March 2005 |
San Diego Gas & Electric |
|
Testimony Supporting Application for Approval of AMI Deployment Strategy and Cost Recovery Mechanism |
March 2005 |
Southern California Edison |
|
Updated Preliminary Advanced Metering Infrastructure (AMI) Business Case Analysis |
March 2005 |
Pacific Gas & Electric |
|
Consumer Portal Stakeholder FAQ & Summary |
March 2005 |
Electric Power Research Institute |
|
Is Real Time Pricing Worth the Effort? |
March 2005 |
UtiliPoint |
|
Impact Evaluation of the California Statewide Pricing Pilot |
March 2005 |
Charles River Associates International |
|
Development and Evaluation of Fully Automated Demand Response in Large Facilities |
January 2005 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |