|
C2: Customer has Access to Recent Energy Usage and Cost at their Site |
June 2006 |
Southern California Edison |
|
C3: Customer Prepays for Electric Services |
June 2006 |
Southern California Edison |
|
C4: External Clients Use the AMI to Interact with Devices at Customer Site |
June 2006 |
Southern California Edison |
|
Responding to EPAct 2005: Looking at Smart Meters for Electricity, Time-Based Rate Structures, & Net Metering |
May 2006 |
Edison Electric Institute |
|
ANSI/CEA-709.2-A-2006 - Control Network Power Line (PL) Channel Specification |
May 2006 |
ANSI |
|
E1: Real Time Operations Curtails or Limits Load for Economic Dispatch (ES&M) |
May 2006 |
Southern California Edison |
|
E2: Utility Procures Energy and Settles Wholesale Transactions Using Data from the SmartConnect System |
May 2006 |
Southern California Edison |
|
Phase 1 Results: Establish the Value of Demand Response |
April 2006 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
Development of a Comprehensive / Integrated DR Value Framework |
April 2006 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
Automated Critical Peak Pricing Field Tests: Program Description and Results |
April 2006 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
SPP Program Final Report: Additional Control Technologies (ACT) for Small/Medium Commercial Customers |
April 2006 |
Southern California Edison |
|
Demand Response: An Introduction Overview of Programs, Technologies, & Lessons Learned |
April 2006 |
Mid-Atlantic Distributed Resources Initiative |
|
ANSI C12.18-2006/IEEE P1701/MC1218 - Protocol Specification for ANSI Type 2 Optical Port |
April 2006 |
ANSI |
|
ANSI C12.21-2006/IEEE P1702/MC1221 - Protocol Specification for Telephone Modem Communication |
April 2006 |
ANSI |
|
D1: Distribution Operations Curtails Customer Load for Grid Management |
April 2006 |
Southern California Edison |
|
D2: Distribution Engineering or Operations Optimize Network based on Data Collected by the AMI System |
April 2006 |
Southern California Edison |
|
D3: Customer Installs and Uses Distributed Generation |
April 2006 |
Southern California Edison |
|
D4: Distribution Operator Locates Outage Using AMI Data and Restores Service |
April 2006 |
Southern California Edison |
|
S1: AMI System Recovers after Outage, Communications or Equipment Failure |
April 2006 |
Southern California Edison |
|
I1: Utility Installs, Provisions and Configures AMI System |
April 2006 |
Southern California Edison |
|
I2: Utility Manages End-to-End Life-Cycle of the Meter System |
April 2006 |
Southern California Edison |
|
I3: Utility Upgrades AMI System to Address Future Requirements |
April 2006 |
Southern California Edison |
|
Phase 1 Results: Incentives and Rate Design for Energy Efficiency and Demand Response |
April 2006 |
Demand Response Research Center, California Public Utilities Commission |
|
Incentives and Rate Designs for Efficiency and Demand Response |
March 2006 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
Minimum Security Requirements for Federal Information and Information Systems |
March 2006 |
National Institute of Standards and Technology, Computer Security Division |