|
Protection Engineer Analyzes Run time Data And Protection Model After Fault Event |
December 2010 |
Electric Power Research Institute |
|
Protection Engineer Changes Settings Across A Network |
December 2010 |
Electric Power Research Institute |
|
Protection Engineer Plans Wide-Area Protection Schemes Based on System Model |
December 2010 |
Electric Power Research Institute |
|
Protection Engineer Sets up Bus Protection Based on Topology of Substation |
December 2010 |
Electric Power Research Institute |
|
Protection Engineer Verifies Protection Models from IEC 61850 Configuration |
December 2010 |
Electric Power Research Institute |
|
Real Time Topology Processor |
December 2010 |
Electric Power Research Institute |
|
Remote Supervisory Control - KCPL |
December 2010 |
Electric Power Research Institute |
|
Study Mode Topology Processor |
December 2010 |
Electric Power Research Institute |
|
Synchro Phasor |
December 2010 |
Electric Power Research Institute |
|
System Engineer Adds a Transmission Line with IEC 61850 Protection |
December 2010 |
Electric Power Research Institute |
|
System Engineer Creates CIM Model From IEC 61850 Configuration |
December 2010 |
Electric Power Research Institute |
|
System Engineer Retrofits A Substation |
December 2010 |
Electric Power Research Institute |
|
Telemetry Definition |
December 2010 |
Electric Power Research Institute |
|
Voltage Security |
December 2010 |
Electric Power Research Institute |
|
Volt VAR Optimization |
December 2010 |
Electric Power Research Institute |
|
Wide Area Monitoring and Control Systems - Emergency Operations Baseline |
December 2010 |
Electric Power Research Institute |
|
Wide-Area Control System Advanced Auto-Restoration |
December 2010 |
Electric Power Research Institute |
|
Wide-Area Monitoring and Control - Automated Control Functions |
December 2010 |
Electric Power Research Institute |
|
Customer (residential and commercial) implements Demand Response system and responds to Demand Response signals from the utility (using AMI) |
December 2010 |
Electric Power Research Institute |
|
Customer Provides Photovoltaic Based Generation Source |
December 2010 |
Electric Power Research Institute |
|
Wide-Area Wind Generation Forecasting |
December 2010 |
Electric Power Research Institute |
|
Import Operational Model to Planning |
December 2010 |
Electric Power Research Institute |
|
Utility Implements Integrated Management of Distributed Energy Resources |
December 2010 |
Electric Power Research Institute |
|
Utility and or Customer Provides Electrical Energy Storage in Conjunction with Photovoltaic |
December 2010 |
Electric Power Research Institute |
|
Wide Area Control System for the Self-healing Grid (SHG) |
December 2010 |
Electric Power Research Institute |