|
ANSI C12.21-2006/IEEE P1702/MC1221 - Protocol Specification for Telephone Modem Communication |
April 2006 |
ANSI |
|
ANSI/ASHRAE 135-2008/ISO 16484-5 - BACnet - A Data Communication Protocol for Building Automation and Control Networks |
April 2008 |
ANSI |
|
ANSI/CEA-709.1-B - Control Network Protocol Specification |
May 2002 |
ANSI |
|
ANSI/CEA-709.2-A-2006 - Control Network Power Line (PL) Channel Specification |
May 2006 |
ANSI |
|
ANSI/CEA-709.3-R2004 - Free-Topology Twisted-Pair Channel Specification |
May 2004 |
ANSI |
|
ANSI/CEA-709.4 - Fiber Optic Channel Specification |
May 1999 |
ANSI |
|
ANSI/CEA-852.1: 2010 - Enhanced Protocol for Tunneling Component Network Protocols Over Internet Protocol Channels |
May 2010 |
ANSI |
|
Anticipates and Responds to System Disturbances (Self-Heals) |
September 2010 |
National Energy Technology Laboratory, U.S. Department of Energy |
|
AP 1000 Nuclear Power Plant |
July 2008 |
Institute of Electrical and Electronics Engineers Power and Energy Society |
|
APEC Smart Grid Initiative (ASGI) |
March 2010 |
U.S. Department of Energy, Pacific Northwest National Laboratory |
|
Appendix E: Comparison of Results Across Dynamic Pricing & Time-Based Rate Pilot Programs |
January 2008 |
Edison Electric Institute |
|
Application Adjusts Load To Meet System Capacity Based On Settings From System Operator |
December 2010 |
Electric Power Research Institute |
|
Application for Adoption of an AMI Deployment Scenario and Associated Cost Recovery and Rate Design (2005) |
March 2005 |
San Diego Gas & Electric |
|
Application for Adoption of an AMI Deployment Scenario and Associated Cost Recovery and Rate Design (2007) |
March 2007 |
San Diego Gas & Electric |
|
Application for Approval of AMI Deployment Activities & Cost Recovery Mechanism |
July 2007 |
Southern California Edison |
|
Application of Automated Controls for Voltage and Reactive Power Management - Initial Results |
December 2012 |
Department of Energy |
|
Application of Building Precooling to Reduce Peak Cooling Requirements |
December 1996 |
Purdue University |
|
Application of Direct Transfer Trip for Prevention of DG Islanding |
July 2011 |
General Electric Energy |
|
Application of San Diego Gas & Electric Company (U902M) for Authority, Among Other Things, to Increase Rates and Charges for Electric and Gas Service Effective on January 1, 2012. |
December 2011 |
San Diego Gas and Electric |
|
Application of San Diego Gas & Electric Company (U902M) for Authority, Among Other Things, to Increase Rates and Charges for Electric and Gas Service Effective on January 1, 2012. |
December 2011 |
San Diego Gas and Electric |
|
Application Of Southern California Edison Company For Approval Of Its Smart Grid Deployment Plan |
July 2011 |
Southern California Edison Company |
|
Approach and Deployment of gridSMART at AEP |
October 2010 |
GridSmart |
|
Architecture Concepts and Technical Issues for an Open, Interoperable Automated Demand Response Infrastructure |
October 2007 |
U.S. Department of Energy, Ernest Orlando Lawrence Berkeley National Laboratory |
|
Arizona-Southern California Outages on September 8, 2011 Causes and Recommendations |
September 2011 |
Federal Energy Regulatory Commission, North American Electric Reliability Corporation |
|
As-Built Equipment Installation-Commissioning |
December 2010 |
Electric Power Research Institute |