|
Utility and or Customer Provides Electrical Energy Storage in Conjunction with Photovoltaic |
December 2010 |
Electric Power Research Institute |
|
Wide Area Control System for the Self-healing Grid (SHG) |
December 2010 |
Electric Power Research Institute |
|
Centralized Application Separates Grid into Islands to Prevent Blackout |
December 2010 |
Electric Power Research Institute |
|
AMI Network (Moving Data Elements from the AMI Head-End to Smart Meter & from the Smart Meter to the AMI Head-End) V3.0 |
August 2010 |
Electric Power Research Institute |
|
CES "Energy Dispatch V 3.1 |
May 2010 |
Electric Power Research Institute |
|
Circuit Reconfiguration V3.1 |
May 2010 |
Electric Power Research Institute |
|
Configuration of a Community Energy Storage (CES) Controller V3.2 |
May 2010 |
Electric Power Research Institute |
|
Configuration of a Community Energy Storage (CES) Unit V3.1 |
May 2010 |
Electric Power Research Institute |
|
Customer Portal V3.0 |
April 2010 |
Electric Power Research Institute |
|
Data Warehouse "The Utility's Smart Grid Clearinghouse V3.0 |
April 2010 |
Electric Power Research Institute |
|
Direct Load Control Event V3.0 |
May 2010 |
Electric Power Research Institute |
|
Distributed Energy Resource Controller Produces Distribution Powerflow Forecast V1.1 |
January 2010 |
Electric Power Research Institute |
|
Field Meter Programming and Meter Firmware Upgrades V3 |
April 2010 |
Electric Power Research Institute |
|
Functions of the Work Management System (WMS) V1.5 |
June 2010 |
Electric Power Research Institute |
|
IVVC Centralized V3.1 |
May 2010 |
Electric Power Research Institute |
|
Integrated Voltage VAR (IVVC) Decentralized V3.1 |
May 2010 |
Electric Power Research Institute |
|
Last Gasp Message "Outage Notification V3.0 |
May 2010 |
Electric Power Research Institute |
|
OMS On-Demand (Poll) V3.0 |
May 2010 |
Electric Power Research Institute |
|
OMS Ping V3.0 |
May 2010 |
Electric Power Research Institute |
|
On-Demand Meter Read from CIS V3.0 |
May 2010 |
Electric Power Research Institute |
|
PEV Charging at Premise V3.0 |
April 2010 |
Electric Power Research Institute |
|
Developing a Pricing Signal V3.0 |
May 2010 |
Electric Power Research Institute |
|
Distributed Energy Resource Controller Adjusts System Settings in Response to Voltage Excursion V1.1 |
May 2010 |
Electric Power Research Institute |
|
Remote Connect/Disconnect V3.0 |
May 2010 |
Electric Power Research Institute |
|
Remote Meter Programming of Smart Meter V3.0 |
May 2010 |
Electric Power Research Institute |