Document Summary
Click title or image to download document
-
-
Update on Smart Grid Program
- Publication Date: June 2009
- Publishing Organization: Electric Power Research Institute
- Format: PDF
- Keywords:
epri, interoperability, new jersey, nist, plans, presentation, program deliverables, progress, red bank, smart grid, status
- Summary:
This set of slides was presented at the Smart Grid Advisory Meeting on June 23-24, 2009 in Red Bank, NJ. This presentation provides information about the National Institute of Standards and Technology (NIST) Smart Grid Interoperability update.
- Summary:
