Skip to Content

Document Summary

Click title or image to download document

S1: AMI System Recovers after Outage, Communications or Equipment Failure

Publication Date: April 2006
Publishing Organization: Southern California Edison
Format: PDF
Authors: John Bubb
Keywords:

advanced meter infrastructure, ami, cause, classify, communications, equipment failure, normal operating state, optimize, recovery response, sce, smart grid, system, use case, utility

Summary:

This use case describes how the Advanced Meter Infrastructure (AMI) system returns to its normal operating state after a communications or equipment failure and attempts to classify the failure cause to optimize the recovery response.