Document Summary
Click title or image to download document
-
-
Risk-Constrained Strategic Bidding of a Hydro Producer Under Price Uncertainty
- Publication Date: June 2007
- Publishing Organization: Institute of Electrical and Electronics Engineers Power and Energy Society
- Format: PDF
- Keywords:
hierarchy of hydro models, hydro power producers, ieee pes, ieee pes general meeting, input-output characteristics, pricing scenarios, risk management constraints, risk measures, scheduling., smart grid
- Summary:
This set of slides was presented at the IEEE PES General Meeting 2007. The presentation discusses the issues with bidding for hydro power producers with details on the hierarchy of hydro models, Input-output characteristics, risk measures, risk management constraints, pricing scenarios, and scheduling.
- Summary:
