Extension Implementation

Publication Date: December 2010
Publishing Organization: Electric Power Research Institute
Format: PDF
Keywords:

budget, commission, construction work, design phase, epri use case repository, management, operations department, smart grid, system

Summary:

This is a use case document that describes how a project, once approved by the management from a budgetary point of view, enters into a detailed design phase before the construction work, the commissioning of the system and finally its hand-over to the operations department.