Document Summary
Click title or image to download document
-
-
E1: Real Time Operations Curtails or Limits Load for Economic Dispatch (ES&M)
- Publication Date: May 2006
- Publishing Organization: Southern California Edison
- Format: PDF
- Keywords:
advanced meter infrastructure, ami, clearinghouse, demand response requests, distributed resources availability and control system, draacs, sce, smart grid, system, use case, utility
- Summary:
This use case proposes a computer system known as the Distributed Resources Availability and Control System (DRAACS), which would serve as a clearinghouse for demand response requests submitted to the Advanced Meter Infrastructure (AMI) system.
- Summary:
