Document Summary
Click title or image to download document
-
-
C2: Customer has Access to Recent Energy Usage and Cost at their Site
- Publication Date: June 2006
- Publishing Organization: Southern California Edison
- Format: PDF
- Keywords:
advanced metering infrastructure, ami, communication systems, costs, data access mechanisms, data refresh frequency, data storage, enabled equipment, interval length, manage energy consumption, messages, meter, sce, smart grid, technology, usage, use case scenario
- Summary:
This use case describes what Advanced Metering Infrastructure (AMI) system enabled equipment and technology (e.g., meter, communication systems and data storage) will be necessary to support customers' needs to manage energy consumption and costs including the types of data (usage, costs, messages), data refresh frequency, interval length and data access mechanisms.
- Summary: