As-Built Equipment Installation-Commissioning
- Publication Date: December 2010
- Publishing Organization: Electric Power Research Institute
- Format: PDF
- Keywords:
circuit breaker, control room, epri use case repository, scada, smart grid, substation, supervisory control and data acquisition
- Summary:
This use case describes the procedure that must be carried out when commissioning a circuit breaker in a substation via a supervisory control and data acquisition (SCADA) system to the control room.