Marblehead Municipal Light Department Interim Report
April 30, 2012
Marblehead Municipal Light Department
This interim evaluation report summarizes results from the first year of the Marblehead Municipal Light Departments (MMLD) two year Critical Peak Pricing (CPP) pilot program. MMLD has undertaken the CPP Pilot programas part of a full system wide deployment of advanced metering infrastructure (AMI) funded inpart by a grant from the U.S. Department of Energy's (DOE) Smart Grid Investment Grant (SGIG) Program. DOE's Technical Assistance Group (TAG) has provided valuable input into the pilot design as well as the evaluation and interpretation of results.